Groundtruth 911 Learning
Work through a 911 GIS question from the records a practitioner can check to the decision a local authority can make.
- Find an answer in the Field Book
- Practice a decision with Cedar Court
- Discuss the evidence in The Aggregation Point
- Evaluate agency training · Open a private support ticket
Which record would you request first?
In fictional release CC-B, the entrance at 118 Cedar Court sits on the right of Pine segment P-12. That side serves even numbers 100 through 116. Lake segment L-9 has the same street name and a range of 100 through 198 even. The assignment register is missing.
Would you extend the Pine range, accept the Lake match, or ask for more evidence? Write down the point, both segment IDs, the relevant side, your observation and the role that can authorize a change.
Compare your decision
118 is even and exceeds 116 by two. Lake passes the number check but conflicts with the access sketch and locality. Ask the addressing coordinator for the original assignment and amendments. Ask the road steward for range history. Keep the discrepancy open until the evidence supports an authorized change.
Try a different address
In fictional release AL-1, point AP-17 records 212 Alder Lane in Juniper. Its entrance is on the right of RD-41, which lists 100–198 even. RD-88 in Mesa lists 200–298 even. Write the next action and hand the record to a second reviewer.
Check the handoff
The reviewer can reproduce 212 > 198 on RD-41, explain why the Mesa record is a poor match, and identify who holds the original assignment. After a change, rerun the same point and both candidates with comparable settings and retain both results.
Read the Field Book explanation · Enroll in the Zoho course to track completion · Compare choices with peers
Follow the rest of the Cedar Court call
- Trace the missing entrance note from the sending incident record to the receiving display.
- Compare the two Cedar Court roads in the original release, where both ranges include 118.
- Explain a zero-finding report when only 900 of 1,000 inputs ran.
- Decide whether the finding was fixed by comparing the inputs and settings of two runs.
Agency training
Bring one recurring road or address decision. In a scoped engagement, one team traces an approved example through a working session and receives an editable workflow map, a practitioner job aid and a worked decision record.
Inspect a sample deliverable
Record A118 · CC-B. Pine P-12 right side, 100–116 even. Observed 118. Lake L-9 fits the number but conflicts with the documented entrance. The addressing coordinator owns assignment evidence and the road steward owns range history. Hold edits pending their review. Acceptance requires a second reviewer to reproduce the comparison and identify the next decision owner.
Request agency training
Tell us what your team needs to practice. Use fictional or publicly cleared details. We use this form to respond to your inquiry.
Prefer email? Request agency training by email. Include your role, team, workflow, intended outcome and timing. Groundtruth 911 will use the inquiry to scope the work. Use public or fictional details at intake.
Customer support
For a product issue or agency-specific question, open a private ticket. Describe the release, what you expected and what you observed. Arrange the authorized transfer method before sending agency files. For an active incident, follow your agency’s operational procedure.
The Field Book
Browse the learning portal or read the complete Field Book below. To suggest a correction, identify the article ID, passage, source edition and what the reader needs to change. Visit TAP for public discussion.
Groundtruth 911 Field Book
Use a question below to locate a reference, worked example, diagram or source. Cite the TAP-FG number when handing a question to another reviewer.
Investigate the Cedar Court range flag · Practice and agency training · Practitioner Q&A
TAP-FG-001 · Where GIS Fits in 911
Someone calls 911 to report smoke at a house. The call reaches the expected answering center, but the map on the call taker’s screen uses an older address list.
The call reached the expected place. We still need to find out whether the older map changes what the call taker sees. Those are separate questions, and each needs its own evidence.
This Field Book helps you work through questions like that. It explains the people, maps and information involved in emergency communications, then shows how to inspect a result and leave a decision someone else can follow. You can start without a background in 911, mapping or software.
Choose the Question You Have
Follow one fictional call through all four lessons, or go straight to the question you have.
- Follow an Emergency Call
- Why Does This Address Connect to That Road?
- What Does a Zero-Finding Report Tell You?
- How Can You Tell a Finding Was Fixed?
Read the figure description
Four reading routes branch from the foundations into GIS, development, operations and specific questions.
Original TAP learning design.
| Reader | Suggested route | What to do at the end |
|---|---|---|
| New to NG9-1-1 | 01 through 06, then 10 and 14 | Explain a call journey in your own words. |
| GIS practitioner | 04, 06 through 16, then 21 | Walk one finding back to its source. |
| Developer or tester | 02, 05, 10 through 17 and 22 | Run a synthetic example and retain the evidence. |
| Program or operations lead | 03, 09, 16 through 20 and 23 | Identify the owner at each handoff. |
A Few Terms to Start With
An answering center is where people answer emergency calls. A common term for it is public safety answering point, or PSAP. GIS means geographic information system: the data, tools and practices used to work with information about places.
NG9-1-1 means Next Generation 9-1-1. It uses Internet Protocol technology, which lets computers exchange information, to support emergency communications. What people can use in a particular area depends on the systems and operating arrangements there. [S01]
How to Use the Examples
The examples are fictional unless a real incident is explicitly identified. They give you information to examine; they do not demonstrate how a particular product performs. Most use a U.S. setting. Interoperability, Security and Regional Differences identifies Canadian context.
A standard, a local practice and a suggestion in this book are different kinds of guidance. A source label such as [S03] points to Sources and Standards, where you can find the publication and edition. Our suggested review procedures help organize work; your agency’s approved procedures govern actual operations.
Bring Back the Part That Is Unclear
Groundtruth 911 maintains the public articles. TAP, The Aggregation Point, hosts the learning discussions and correction reports. People across jurisdictions, employers and software vendors are welcome. This education should be useful even if you never buy from Groundtruth 911.
Try It
Choose one question above that you would like to explain to another person. If the explanation skips a step, note the article ID and the sentence or diagram where you got stuck.
Practice Cedar Court · Discuss or suggest a correction · Contents
Follow the Data Behind a 911 Call · Part 1 of 4
TAP-FG-002 · Follow an Emergency Call
A caller reports smoke at 118 Cedar Court. Cedar, the local public safety answering point (PSAP), answers as expected. But the call taker sees an older map, and a note about a blocked entrance is missing. Follow the call and its records to find out where each discrepancy could have happened.
Follow the Journey
The request enters through a communications provider’s network. Emergency routing functions direct it toward an answering center. A call taker gathers information and follows local procedures. Dispatch work uses that information to coordinate the response. Actual arrangements can include transfers, overflow destinations and older systems, so this is a teaching overview rather than a complete system design. [S01; S02]
Read the figure description
The call-handling path links the originating network, routing functions and answering center. Routing functions exchange a query and result with the ECRF. A separate GIS maintenance and provisioning path supplies lookup data. The answering center hands incident work to dispatch. This is a conceptual grouping, not a media path; LVF and other data consumers are omitted for clarity.
Conceptual illustration informed by [S02] and [S25]. Solid arrows group call handling; dashed arrows identify separate exchanges. This is not a media path or a network implementation diagram.
In the drawing, the call-handling arrows run across the top. The lookup below them answers a routing question. The data-update path supplies information used by that lookup. Maintaining map data is separate work from handling an individual call.
The drawing leaves out many network components and the paths carrying audio or other media. It also leaves out other services that use GIS data. An arrow does not establish that every application uses the same data release.
Keep Four Things Separate
The call is the communication being handled. The location describes a place. The incident record stores information about the event. The responding unit is a resource assigned to help, such as a fire crew. These distinctions help you ask a precise question; they are not a claim that every system has four particular database records.
Also distinguish the caller’s location from the emergency’s location. Someone can call about an event happening elsewhere. Before comparing two location fields, check what each field describes.
Apply That to Cedar Court
Suppose the map application identifies its address layer as MAP-41, while the designated current release is MAP-42. The labels differ. You still need a comparison to know whether anything at 118 Cedar Court differs. You also need evidence about the routing service before claiming it used the older map release.
Now suppose the sending incident record says “rear entrance blocked,” but the receiving record has a blank field. The note may have been omitted, translated incorrectly, stored somewhere else or hidden by the display. The blank field gives you a specific handoff to investigate; it does not identify the cause.
Computer-aided dispatch, or CAD, supports dispatch and incident records. The National 911 Program describes barriers to exchanging this information across systems and organizations. Check the incident-data exchange separately from whether the call arrived. [S16]
| Handoff | Question to ask | Useful evidence |
|---|---|---|
| Provider to emergency network | Was the request delivered with the expected location information? | Approved test record and provider trace reference |
| Core services to PSAP | Was the selected destination correct for this scenario? | Expected destination and observed result |
| Call handling to dispatch | Did the receiving workflow get the necessary information? | Field comparison and operator observation |
| GIS maintainer to consuming service | Which data release was active? | Package identifier and load acknowledgment |
Technical Detail When You Need It
In NENA’s i3 architecture, the Emergency Call Routing Function, or ECRF, returns routing information using location and service inputs. The Emergency Service Routing Proxy, or ESRP, applies routing policy. A lookup response does not assign a vehicle. Core 911 System Terms explains these roles. [S02, sections 3.4, 4.2 and 4.3]
Where Did the Entrance Note Go?
The sending record says “rear entrance blocked.” The receiving field is blank. Which records would you compare first?
See one way to trace the note
Start with the message that left the sending system. Is the note there? Then check what the receiving system accepted, what it stored, and what the call taker could see. The first difference tells you where to investigate. Cedar answering the call confirms only that it reached the expected center.
Part 2 · Why Does This Address Connect to That Road?
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-003 · Who Owns the Next Step?
Two neighboring teams disagree about which answering center serves Cedar Court. One points to the city boundary. The other has a service agreement showing a different area.
A map editor can change the line on the screen. That does not give the editor authority to decide which service should cover the street. First identify who can make the decision and what evidence that person needs.
Separate the Responsibilities
The person who approves an address or service boundary may be different from the person who edits it, checks it or loads it into a system. A vendor may operate an interface without owning the local addressing decision. One person can hold several roles, but each responsibility still needs a name.
NENA’s stewardship guidance distinguishes GIS data providers from 9-1-1 authorities and describes coordination among contributors. The roles below are a practical starting point to confirm locally, not a universal organization chart. [S04; S11]
| Decision or task | Typical participant | Confirm locally |
|---|---|---|
| Assign an official civic address | Addressing authority | Who can approve a new or changed address? |
| Maintain source GIS features | Designated GIS data provider | Which database is authoritative? |
| Approve PSAP service coverage | 9-1-1 authority and affected PSAPs | Who signs the agreement? |
| Approve responder service coverage | Responsible service authorities | Which service and effective date? |
| Aggregate submissions | Regional or state program or provider | Who resolves cross-border conflicts? |
| Load and operate consuming services | Authorized service operator | Who acknowledges activation and rollback? |
| Authorize release | Named local project role | Who accepts unresolved risks? |
Resolve the Cedar Court Disagreement
Keep both source documents and identify their effective dates. Write the exact question that needs an authorized answer: which answering center is responsible for this street, for which conditions, and from what date?
Ask each party to identify its approving role. Retain both proposed versions until the decision is made. Once approved, record who will edit the data, who will check it and who will confirm that the receiving service uses the change.
“GIS will fix it” leaves the decision unanswered. “The two 9-1-1 authorities will confirm primary PSAP coverage for Cedar Court effective November 1” identifies a responsibility and an outcome. The date in this example is fictional.
Learn From an Implementation Example
In a published November 2023 webinar, Arizona practitioners described coordinating local, tribal, state and other contributors through existing geospatial relationships. The useful lesson is to identify the people whose decisions and data the work depends on. The dated example does not prescribe your staffing or meeting schedule. [S29, PDF pp. 2–4]
Try It
Choose one handoff and name the decision maker, editor, reviewer and service operator. Which role is still unclear?
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-004 · Caller Location and Incident Location
A clinic’s official address is 118 Cedar Court. Visitors enter from Cedar Court, but ambulances use an entrance on Oak Lane.
The address, the building’s position and the ambulance entrance can all describe the same site correctly. They answer different questions. Before judging a location, decide which question you need it to answer.
Three Questions About One Place
An address helps describe the place. A service lookup helps identify the service responsible for a location. Entrance and access information helps explain how to reach the site. Knowing one does not automatically supply the others.
Read the figure description
Three panels separate describing a location, selecting a service and reaching the incident entrance.
Original TAP explanatory framework; protocol context [S25; S26].
Coordinates describe a position with numbers. Those numbers need a coordinate reference system, the information that tells a mapping system how to interpret them. An address instead uses elements such as a street name, house number and unit.
Neither description alone necessarily tells you the correct entrance, floor or unit for the task. A precisely measured point can still represent the wrong thing for the question being asked.
Review the Clinic Example
Suppose a tool selects Oak Lane because it is nearest to the clinic’s map point. That may explain the tool’s choice. It does not establish that the official address should change from Cedar Court, or that the point should move.
First check what the point is intended to represent. It might mark a building, a site or an entrance. Compare it with the documented placement method and the designated source for that information. An entrance point and a building-center point should not be expected to have identical coordinates.
Then write the unresolved question. Are you checking the official address, the position of the point, the answering destination or physical access? Ask the responsible authority about that question rather than treating all differences as the same location error.
Keep the Evidence With Its Meaning
Record what was measured or described, its source and its observation date. Compare records that represent the same thing. If two sources serve different purposes, retain that distinction instead of forcing their values to agree.
Drawings in this book without coordinate axes are schematics. They explain relationships and should not be measured as maps.
Technical Detail When You Need It
Standards often call an address-based description a civic location and a coordinate-based description a geodetic location. The Location-to-Service Translation protocol, or LoST, supports requests for service contact information using these types of location. It does not describe the driving route to an entrance. [S25; S26]
Try It
Explain why Oak Lane could be the nearest road while Cedar Court remains the clinic’s correct address street.
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-005 · Core 911 System Terms
A system diagram may draw a network, a lookup service and a call-routing service as similar boxes. Those boxes do different jobs. Start with the job each one performs, then learn its abbreviation.
A network carries information between systems. A service performs a task. An interface is the agreed way systems exchange information. An arrow should tell you what crosses that interface.
Read the Jobs Before the Initials
NENA is the National Emergency Number Association. Its i3 standard describes the architecture and interfaces for NG9-1-1. In that architecture, an Emergency Services IP Network, or ESInet, carries communications. Next Generation Core Services, or NGCS, perform functions used to process emergency calls.
Other services answer narrower questions. The ECRF returns routing information using location and service inputs. The ESRP applies routing policy. The LVF checks civic location information, such as address elements. The Spatial Interface supplies GIS data to services that consume it. [S02; S05]
| Term | Plain-language cue | Question for your provider |
|---|---|---|
| ESInet | Emergency Services IP Network: the network carrying emergency communications | What endpoints and interconnections are in scope? |
| NGCS | Next Generation Core Services: functions used to process emergency calls | Which services are included in this contract? |
| ECRF | Emergency Call Routing Function: a location-and-service lookup supporting routing | Which data release supports this query? |
| ESRP | Emergency Service Routing Proxy: routes calls using the applicable policy | Which approved policy applies in this scenario? |
| LVF | Location Validation Function: checks civic location information | Which civic elements were recognized or rejected? |
| SI | Spatial Interface: supplies GIS data to consuming functions | How are loads, failures and activation confirmed? |
| BCF | Border Control Function: controls access at a network boundary | Who operates and monitors the boundary controls? |
| LIS | Location Information Server: supplies location information | Who supplies and maintains the location information? |
Ask What Each Arrow Carries
An arrow may represent a message that sets up a call, voice or other media, a location query, a map-data update, or a receipt confirming a delivery. These exchanges are not interchangeable. If an arrow only says “data,” ask which information it carries and why.
For example, a file may be delivered during maintenance before a call occurs. During call handling, a service may query information already loaded. The diagram should not imply that a live call passes through the GIS editor who prepared the data.
The grouped drawing in Follow an Emergency Call does not show every service. It does not say that voice passes through the ECRF or that every call makes a new LVF request. For an actual implementation, obtain diagrams showing the provider’s interfaces and what happens during failures and transfers.
Match the Evidence to the Job
For a data update, ask which package was loaded and when it became active. For a lookup, ask whether the response matched the expected result for the test. A green application-status icon cannot answer both questions.
The LVF’s role is also different from running a set of quality checks on an entire GIS dataset. The word validation appears in both contexts, so name the function or check you mean.
Try It
Choose a diagram and label every arrow with the information it carries. Mark any arrow whose meaning is still unclear.
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-006 · Choose the Right GIS Data Model
Your database stores an address number as 118A. A receiving file accepts numbers only. Deleting the A makes the value fit, but changes the address information.
Before converting a dataset, work out how the receiving structure represents the source’s meaning. A successful file load is only one checkpoint.
Know Which Structure You Are Using
A data model describes information and its relationships. A schema defines a particular storage structure, including field names and value types. A field holds a named piece of information, such as a street name. A receiving profile is the particular set of requirements the recipient expects.
A standard, a template, your local database and the delivery file can all be called “the model” in conversation. Name the actual item so everyone is discussing the same thing.
| Item | Its job | What it cannot establish alone |
|---|---|---|
| Standard | Defines the applicable structure and meaning | Whether a particular dataset meets it |
| Template | Provides an implementation of a structure | That loaded values are complete or accurate |
| Local source database | Supports daily maintenance and local workflows | That its export matches the receiving schema |
| Exchange package | Carries an identified release to another party | That the receiving service activated it |
Map the Meaning Before Changing Values
For a fictional source field named HouseNo, identify the target concept and how it handles a suffix such as the A in 118A. Keep the original value. If its meaning is unclear, ask for an addressing or data-model decision rather than inventing a conversion.
Document each source field, its target and any transformation. A transformation might separate components or change a value’s format. Also identify information with no target field and decide how it will be preserved.
Test ordinary and unusual values, including units, suffixes, missing values and long text. Compare record counts and identifiers before and after conversion. Keep the original data, the mapping instructions and the conversion results together so another person can reproduce the work.
An export can preserve a wrong address perfectly. A structural check can finish without testing whether that address describes the right place. For examples of how to record these limits, see What Does a Zero-Finding Report Tell You? and How Can You Tell a Finding Was Fixed?.
Technical Detail When You Need It
The cited NENA GIS model is NENA-STA-006.3-2026. Its main body describes a flat-file model, while Appendix E describes related relational structures for the Spatial Interface. It distinguishes Required, Strongly Recommended and Recommended layers. Use the exact layer and field definitions in the edition and receiving requirements applicable to your project. [S03]
NENA’s repository includes version-specific documentation and templates. A template’s name does not establish that it matches the version your receiving service uses. Record the intended version before mapping fields. [S33]
Try It
Explain what a successful load tells you, and name one important address question it does not answer.
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-007 · Read a Road Centerline
A road line on a map has a stored start and end. Its direction matters because left and right are read while facing from the start toward the end.
The road record can also contain street-name components, address ranges and information about each side. Read those values with the geometry rather than treating the line as a picture alone.
Read One Road Record
In the fictional drawing, Cedar Court segment R001 runs west to east. The left side has an odd-numbered range of 101–199. The right side has an even-numbered range of 100–198.
An address range is the interval of numbers recorded for that side. Parity describes the number pattern, such as odd or even. Address 118 fits the right-side range and its even parity. That makes it a possible match under the example’s rule. It does not prove that a building exists at 118 or that its map point is correctly placed.
Read the figure description
A west to east road arrow has odd example addresses on the north or left side and even example addresses on the south or right side. This arrangement is fictional.
Original synthetic example; direction and parity context [S08].
| Question | Look at | Do not infer |
|---|---|---|
| Which way is the feature directed? | Start and end geometry | North is always the start |
| Which street is represented? | Full address components and approved aliases | A matching base name is sufficient |
| Could this number be represented here? | Range and parity under the applicable profile | Every possible number is an occupied building |
| Who maintains this part? | Ownership and boundary agreements | The nearest editor owns it |
| Has the feature changed identity? | Split, merge and replacement history | A new object identifier means a new real road |
Notice What an Edit Can Change
Reversing the stored line changes its direction. Side-dependent values then need review. Splitting one road record into two also requires coherent identifiers and address ranges for the resulting records. The road can look almost unchanged at a small map scale while its stored relationships change.
Keep a record of splits, merges and replacements so related address records and earlier findings can be followed to the current data.
Check the Context Too
Imagine another Cedar Court in a different community with the same number range. The street name and number alone no longer distinguish the two. Check the full address components and the relevant geographic or jurisdiction context.
Oklahoma’s training manual illustrates direction and parity. Its software steps describe a historical state workflow, not a universal current procedure. The directional drawing here is fictional. [S08, printed p. 12]
Try It
Point to the side where 118 fits. Then explain why that observation does not establish the correct match if another Cedar Court has the same range.
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-008 · Read an Address Point
Two map labels both say 118 Cedar Court. One record represents Unit 2 and the other represents Unit 3. They look identical because the labels hide information still present in the records.
Before deleting a possible duplicate or moving a point, find out what each record represents.
Start With the Point’s Purpose
An address point is a map point linked to address information. It may represent a site, a structure or another location defined by the applicable model and collection policy. Its intended meaning determines how its placement should be reviewed. [S03, section 4.2]
Open the full record, including building or unit information. Compare its identity, source and purpose with the other record. Two identical display labels do not establish duplicate features. Two different database row numbers do not establish different real-world places either.
| Question | Evidence to inspect | Possible next step |
|---|---|---|
| What does the point represent? | Collection method and source record | Confirm the intended placement |
| Is the address official? | Responsible addressing authority record | Request an addressing decision |
| Is this a real duplicate? | Full civic elements, unit and geometry | Compare source identities |
| Does a name change explain the mismatch? | Approved alias or rename history | Retain the link between versions |
| Does access differ from the address road? | Entrance or access documentation | Review access without rewriting the civic address |
Review the Apartment Example
Confirm whether the collection is intended to represent units and how those units should be identified. Check the designated addressing source and the point-placement policy. Then compare the relevant road records from the same saved data release.
If a change is authorized, keep the old and new values and the evidence supporting the decision. If the evidence remains incomplete, record the question and its owner instead of choosing the most convenient value.
Preserve Unusual Addresses
Do not invent a house number, remove a meaningful suffix or change a community name simply to satisfy a check. An unusual result may call for a different representation, a documented exception, a change to the checking rule or a correction in another source.
Wisconsin’s guidance provides a state-specific example of address-to-road quality control and coordination with older records. Keep its jurisdiction attached when applying or discussing it. [S09]
Try It
Explain what you would inspect before deciding the two Cedar Court labels are duplicates.
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-009 · Understand Service and Provisioning Boundaries
A county maintains an address, a regional center answers emergency calls for it, and a fire district provides fire service. Those responsibilities can cover different areas.
Changing every boundary to the town limit would erase meaningful differences. First name the responsibility the boundary represents.
Read the Boundary’s Purpose
A provisioning boundary concerns responsibility for supplying GIS data. A primary PSAP boundary concerns the area served by an answering center. Emergency service boundaries describe coverage for particular services. A polygon is the stored shape used to represent an area. [S03; S13]
Read the figure description
Three schematic maps show a data provider area, two PSAP areas and distinct responder service areas over the same place.
Original schematic; boundary concepts [S13].
A fire-service polygon overlapping a law-enforcement polygon is not the same condition as two polygons making conflicting claims to the same primary service. Likewise, an area outside the intended coverage extent is not automatically an internal gap.
Review a Shared Edge
Identify the boundary type, the service, the intended coverage area and the effective date. Compare neighboring submissions that describe compatible points in time. Ask the affected authorities which agreement or other designated source establishes the responsibility.
Once the authorized decision is recorded, review the geometry and any dependent road, point or service assignments. Coordinate delivery so neighboring changes do not become inconsistent simply because one arrives earlier.
The Interstate Playbook discusses GIS sharing and provisioning responsibilities as planning context. Local agreements and current receiving requirements still need to be identified. [S13]
Keep Uncertainty Visible
A drawing cannot settle a service dispute. If responsibility remains unresolved, record the decision needed, its owner and any approved temporary treatment. Use the agency’s operational escalation route for a current service concern rather than leaving it only in a routine mapping queue.
Try It
Identify which boundary answers “who supplies this data” and which answers “which answering center serves this location.”
Practice Cedar Court · Discuss or suggest a correction · Contents
Follow the Data Behind a 911 Call · Part 2 of 4
TAP-FG-010 · Why Does This Address Connect to That Road?
Two Cedar Court releases. The original example below uses two roads whose ranges include 118. In the CC-B range investigation, Pine ends at 116 and Lake still includes 118. Keep the release ID with the decision.
The call at 118 Cedar Court raised a question about which map data was loaded. Now open the address record itself. Two roads carry the name Cedar Court, one in Pine and one in Lake. The map draws a long line from the address to the Lake road. How did it choose?
That connector is commonly called a fishbone. It shows an address-to-road relationship produced by a particular method. It is not a driveway, an emergency vehicle route or the path of a 911 call.
Find Out What Produced the Picture
One tool may use address components and road ranges. Another may connect to the nearest road, use a stored association or calculate a position along a segment. Different methods can produce different pictures from the same data.
Record the method, the input release and the settings before interpreting the pattern. A distance limit needs units and a stated measurement method; it is not a universal NG9-1-1 tolerance.
Read the figure description
Two panels compare orderly synthetic connectors with long and crossing connectors to an unintended candidate road. Address points, roads and connectors have separate symbols.
Original synthetic data; no live customer geography. Concept context [S08; S07].
| Observed pattern | Questions to investigate | What it does not prove |
|---|---|---|
| Long connector | Wrong candidate, unusual setback, placement method or access relationship? | The address point must move |
| Crossed connectors | Range orientation, point ordering, duplicate candidate or curve geometry? | Every crossing is an error |
| No connector | Excluded input, missing attributes, unmatched address or tool failure? | The address does not exist |
| Many points reach one segment | Expected shared road, ambiguous names or broad range? | All associations are correct |
| Neat consistent pattern | Do attributes and authoritative records also agree? | The dataset is ready for operational use |
Investigate the Unusual Connection
In the fictional example, A118 connects to another Cedar Court across the study area. Preserve the address identifier, the selected road and other plausible roads. Compare their full street components, community context, number ranges and parity.
Check the tool’s selection rule. If more than one road remains plausible, keep the uncertainty visible. An automated selection does not explain why the choice was justified.
Then consult the designated addressing evidence. The point, the road, the method, its settings or the expected relationship may explain the result. Do not assume the point is the part that needs changing.
If an authorized correction is made, repeat a comparable check and retain the before-and-after evidence. How Can You Tell a Finding Was Fixed? shows how to connect that work to a decision record.
Use the Pattern as a Clue
Long or crossed lines can identify a useful place to investigate. A neat pattern can still hide errors if records were prepared or matched incorrectly in a consistent way. A missing connector may mean the input was excluded, could not be processed or had no match.
NSGIC describes fishbone analysis as a way to visualize potential issues, not a validation by itself. Oklahoma’s historical training manual also uses fishbones for review. [S07, p. 2; S08, printed p. 23]
Which Cedar Court Fits the Address?
Pine and Lake each have a Cedar Court with even house numbers from 100 to 198. The community field is blank for number 118. What would you check before accepting the line to Lake?
See what to check
Look up both road records in the same data release. Check how the tool chose between them and what the addressing authority records for 118. The line shows which road the tool selected. You still need evidence that the address belongs there.
Part 3 · What Does a Zero-Finding Report Tell You?
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-011 · Explain an Address Match
118 Cedar Court could refer to more than one road. A matching tool needs a stated way to decide which records belong together. The selected road alone does not tell you whether that decision was sensible.
Work Through One Match
Use the fictional address A118: 118 Cedar Court, Pine community, Unit 2. Three roads are available. R001 is Cedar Court in Pine, with even numbers from 100 to 198 on its right side. R002 is Cedar Court in Lake. R003 is Cedar Avenue in Pine.
For this exercise, a road must agree with the full street name, community and relevant number range. Only R001 meets those conditions. This is a teaching rule chosen for the example. It is not the rule used by every vendor or by the Location Validation Function.
| Candidate | Name and community | Number and parity | Exercise result |
|---|---|---|---|
| R001 | Cedar Court in Pine | 118 fits even range 100–198 | One plausible candidate |
| R002 | Cedar Court in Lake | 118 fits its range | Reject under this exercise’s community rule |
| R003 | Cedar Avenue in Pine | 118 fits its range | Reject under this exercise’s street-type rule |
Now remove the community value. Both Cedar Court records may remain possible. Choosing the closest road would add a new rule. Keep both candidates visible until the approved method or better evidence resolves the choice.
Read the figure description
A flowchart filters by address context and candidate criteria, then branches to zero, one or multiple plausible candidates.
TAP teaching workflow. It illustrates reviewable choices and is not a required matching algorithm.
Keep the Reason With the Result
Save the original address and road records, any changes made for comparison, the possible matches and the reason one was selected. A change for comparison might expand an abbreviation or recognize an approved alternate street name. Keep that change separate from an authorized correction to the source data.
Use distinct outcomes: one selected match, no match, more than one possible match, an excluded input, or a processing failure. These outcomes need different follow-up. They should not all become a blank field.
When You Need More Detail
A search distance is a setting, not a national NG9-1-1 tolerance. Changing a search from 25 to 50 units may change the possible matches. Record the units, coordinate reference system and method used to measure distance. Record how the tool handles ties too.
A small saved test example helps another reviewer repeat the decision. Include the expected result and the settings needed to obtain it. This article describes TAP's recommended evidence practice; the actual implementation must document its own behavior.
Try It
Remove one condition from A118's matching rule. Explain which additional road could qualify and what information would help you decide.
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-012 · Review Geometry and Topology
A map check flags the end of Cedar Court. The road really ends there. Should someone extend it just to clear the flag? No. First establish what the flag means and whether the mapped condition is wrong.
Shape and Connection Are Different Questions
Geometry is the shape of a map feature: for example, the line representing a road. Topology describes spatial relationships, such as whether lines connect or areas overlap. A topology check can identify a relationship that needs review. It cannot decide every real-world exception for you.
Read the figure description
A cul-de-sac has an intentional terminal node, an undershoot stops before a junction, a bridge crosses without an at-grade connection, and a boundary gap leaves an internal sliver.
Original schematic; not a universal topology rule set.
A line endpoint flagged by a connection rule is often called a dangle. It could be a real dead end, the edge of the area included in the file, or a road that was accidentally drawn short of a junction. Those explanations call for different decisions.
Two road lines can also cross without a usable junction. One may pass over the other on a bridge. A flat map alone does not establish whether vehicles can move between them.
| Example | Evidence to seek | Example Review Outcome |
|---|---|---|
| Road stops at a real dead end | Imagery, field or authoritative road record | Document a valid terminal condition |
| Road stops short of a real junction | Comparable source geometry and connectivity policy | Correct an unintended undershoot |
| Two roads cross on a bridge | Grade separation evidence | Preserve the intended relationship |
| Gap between same-service polygons | Coverage agreement and neighboring snapshots | Resolve a confirmed coverage issue |
| Sliver outside intended coverage | Declared study extent | Review scope before classifying |
Make the Smallest Supported Repair
Keep the original geometry and the rule that produced the flag. Check the road inventory, imagery or other appropriate evidence, including its date and limits. Confirm how the receiving application represents connections.
Do not move every nearby endpoint together merely to reduce the count of flags. That can create a connection that does not exist or move an approved boundary. Test a proposed batch repair on difficult examples and inspect the changed features before accepting it.
Explain an Exception
An exception is a documented reason that a flagged condition is acceptable under the applicable rule. Write the feature ID, rule, reason, evidence and responsible decision. For example: “The endpoint is the documented end of Cedar Court. The road inventory dated October 1 shows no through connection.” That is more useful than “looks fine.”
Oklahoma's historical training manual includes per-feature exception handling in its topology exercise. It is a practical example, not a universal rule for all projects. [S08, printed p. 15]
Try It
Compare a real dead end with a line drawn short of a junction. What evidence would let the next reviewer tell them apart?
Practice Cedar Court · Discuss or suggest a correction · Contents
Follow the Data Behind a 911 Call · Part 3 of 4
TAP-FG-013 · What Does a Zero-Finding Report Tell You?
You have two possible roads for 118 Cedar Court. A colleague hands you a report showing zero findings for the address file. Before using that report to settle the match, find out which addresses the check reached and what question it tested.
Count the Records the Check Reached
Imagine a file containing 1,000 records. A check runs on 900. A filter excludes 50, and another 50 cannot be read. The check reports no findings for the 900 processed records. A separate boundary check was disabled.
That result does not establish anything about the excluded or unreadable records. It also does not establish that the 900 records passed other checks that were never run. Put the coverage beside the result so a reader can see both.
Read the figure description
Five displayed groups cover structure and allowed values, shapes and spatial relationships, agreement among layers, agreement with legacy records, and integrated operational behavior. The status strip distinguishes checks that executed, inputs excluded from scope and checks that failed to run.
TAP teaching categories. These are not a standard severity scheme.
| Family | Question | Example |
|---|---|---|
| Schema | Can the expected structure be read? | A required input field is absent |
| Domain and value | Are values allowed and meaningful? | A placeholder is stored as an agency identifier |
| Geometry and topology | Are shapes and relationships usable? | An unintended gap appears between adjacent areas |
| Cross-layer | Do related features agree? | An address has multiple plausible road matches |
| Legacy reconciliation | Do transition datasets describe compatible places? | A road rename remains unresolved in a legacy table |
| Operational acceptance | Does the integrated system behave as expected? | A planned transfer does not preserve expected information |
The reporting pattern above is a TAP teaching recommendation, not a nationally prescribed metric. In a real report, identify the input version, rule version, settings, included records, exclusions and processing failures.
Separate Importance From Progress
Severity describes the importance assigned to a finding under a named policy. Status describes what has happened to it. A high-priority finding may still be unreviewed. A reviewed finding may still be unresolved. “Reviewed” does not mean “corrected.”
An unusual result is also not automatically a data error. NSGIC's 2026 recommendations explain that an apparent anomaly can be valid, that an error may be in legacy records rather than GIS, and that the recommended checks do not cover every maintenance need. [S07, pp. 1–2]
Ask What Remains Unknown
A useful conclusion is specific: “This check completed for these inputs under these rules and found no reported exceptions.” List important questions outside that scope.
A data checker can support a readiness decision. Its finding count does not establish that the full operational system works. Conformance testing examines applicable requirements; interoperability testing examines how components work together. Both matter. [S15]
How Would You Report Zero Findings?
Of 1,000 addresses, 900 completed the matching check, 50 were excluded and 50 failed to process. The report lists zero findings. The boundary check was turned off. What would you tell the person deciding whether to accept the release?
Read a sample answer
“The matching check reported zero findings for the 900 addresses it finished checking. It gave us no result for the other 100 addresses or for the boundaries.”
Part 4 · How Can You Tell a Finding Was Fixed?
Practice Cedar Court · Discuss or suggest a correction · Contents
Follow the Data Behind a 911 Call · Part 4 of 4
TAP-FG-014 · How Can You Tell a Finding Was Fixed?
The report total left a question open about one address. Now follow 118 Cedar Court through an authorized correction and a repeat check. A colleague taking over tomorrow needs enough evidence to tell which change resolved the finding.
Follow Finding F0142
In this synthetic example, finding F0142 reports two possible roads for address A118 under matching settings P02. The reviewer consults the official addressing record and finds that the source address is missing its community value.
The addressing record identifies Pine as the community. An authorized editor adds Pine in a new copy of the data. A repeat run using the same matching rule now returns one candidate. The reviewer links the original result, addressing evidence, approved change and repeat run. The original finding remains available.
Read the figure description
A source snapshot and configured rule produce a finding. A reviewer records evidence and a decision. An approved change is linked to a rerun and release while the original observation remains available.
Original TAP recommended practice.
| Field | Synthetic example | Why keep it |
|---|---|---|
| Finding identifier | F0142 | Allows discussion without relying on row order |
| Source feature and snapshot | A118 in SNAP07 | Identifies the exact input |
| Rule and version | MATCH_CONTEXT revision 3 | Explains which question was tested |
| Settings and execution | Profile P02; run RUN09 | Preserves how the result was produced |
| Observed evidence | Two surviving candidates R001 and R002 | Separates observation from interpretation |
| Human decision | Needs addressing authority review | Records judgment without altering the observation |
| Reviewer and time | Reviewer role; timestamp | Makes accountability and sequence visible |
| Follow-up and release | Decision D22; package PKG08 | Connects action to a specific delivery |
The finding record in this article is TAP's recommended practice. It is not a NENA-required field list. Use it to check whether someone else can follow the reasoning, then adapt it to the approved local system.
Keep Three Statements Separate
Observation: the run returned two candidates. Decision: evidence showed a missing community value that an authorized editor should correct. Verification: a comparable run on the revised record returned the expected candidate.
Each statement needs its own support. A screenshot of the first result does not prove the correction worked. A note saying “fixed” does not identify what changed or who had authority to change it.
Check Why a Finding Disappeared
Read the figure description
A finding absent from a later run branches into same check and scope, changed rule or scope, excluded feature, or failed execution. Only comparable successful execution can support a correction conclusion.
Original TAP review logic.
A later report may omit F0142 because the problem was corrected. It may also omit it because the address layer was left out, the record was deleted, the rule changed or the run failed. Compare the input, feature history, test definition and coverage before closing the finding.
If the record was intentionally deleted, keep the authority and any replacement record. If the test changed, describe what the new result establishes. If the evidence is incomplete, keep the outcome unresolved and name the next action.
Which Retest Supports Closing the Finding?
RUN10 included the corrected address and returned one candidate. RUN11 omitted the address layer. Which result would you attach to the original finding, and what else would you keep?
Read a sample review note
“I would attach RUN10 and link the authorized edit to the updated address record. I would record the rule, settings and completed retest so another reviewer can repeat the check. RUN11 tells us nothing about this address because the address layer was missing.”
Explore the Field Book by topic
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-015 · Reconcile GIS With Legacy Records
Cedar Court has officially become Cedar Way. The GIS file has the new name, an older database has the old name, and the sign on the building has not changed. Making all three labels identical today may hide information people still need.
Compare Meaning and Dates
First find the rename approval and effective date. Identify which source is responsible for each value. Then check whether the old name must remain available as an approved alternate name while the change reaches other systems.
Read the figure description
GIS and legacy snapshots are compared using an explicit mapping. Differences go to evidence review and the responsible owner, then to coordinated corrections and verification.
Original TAP recommended reconciliation workflow.
MSAG means Master Street Address Guide. ALI means Automatic Location Identification. You will encounter these terms when working with older 911 systems and transitions to newer ones. NENA's GIS Data Transition document describes responsibilities for GIS providers, 911 authorities and MSAG coordination. [S06, sections 3–4]
The historical Oregon-hosted presentation helps explain relationships between older databases and GIS functions. Its diagrams are background, not a current implementation specification. [S32, slides 12–14]
| Observation | Possible explanation | Useful next action |
|---|---|---|
| No GIS candidate | Missing feature, parsing difference or old address | Review source authority and mapping |
| Several GIS candidates | Insufficient context or repeated street names | Keep unresolved alternatives visible and inspect candidates |
| Different community values | Postal, municipal or legacy naming difference | Confirm the meaning of each field |
| Different range coverage | Segment split, legacy range or source error | Compare full ranges and effective dates |
| Records disagree after rename | Unsynchronized update cycle | Coordinate correction and verify consumption |
Work Through the Difference
Use approved copies and record their dates. Write down which fields mean the same thing in each source. Keep original values alongside any changes made only to make comparison easier.
Classify the cause of a difference, not just its match score. A missing record, old street name, missing unit and incompatible field meaning need different follow-up. Send each issue to the person responsible for the source or decision. Verify authorized corrections in the affected systems through the agreed process.
No source wins every disagreement merely because it is newer or stored in GIS. The relevant authority, meaning and effective date determine what evidence matters.
Keep Operational Information Protected
A publicly available map does not make associated subscriber or call information public. Keep operational comparisons in their approved environment. Use synthetic examples in TAP unless a real example is explicitly cleared for sharing.
Try It
What evidence would show that Cedar Way's legacy record needs an update? What evidence would show that retaining Cedar Court as an alternate name is still useful?
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-016 · How GIS Data Reaches a Service
Sending a file does not establish that a service is using it. A reliable handoff follows the exact package from the sender to its confirmed use.
Follow Package PKG09
In this fictional example, a local team submits PKG08. The organization combining local contributions rejects two records. The local team corrects them and sends PKG09. The service operator activates PKG09 at the agreed time, but a map application still displays an older saved view of PKG08.
One “submitted” timestamp cannot explain that sequence. Keep the evidence for each milestone.
Read the figure description
A six-stage loop connects authoritative maintenance, local review, aggregation, provider checks, confirmed activation and discrepancy feedback.
Original TAP lifecycle illustration; context [S04; S05; S10].
| Milestone | Evidence to retain | Question it answers |
|---|---|---|
| Prepared | Snapshot identifier and manifest | What exactly was packaged? |
| Reviewed | Coverage report and authorized review outcome | What was checked and accepted locally? |
| Received | Receiving acknowledgment | Did the next party receive it? |
| Accepted or rejected | Provider report with package identifier | Did it meet that receiver’s checks? |
| Activated | Operator-confirmed release and time | When did the consuming service use it? |
| Verified | Approved scenario results | Did the expected changes appear? |
Know What Each Handoff Does
Aggregation combines contributions into a broader dataset. Provisioning supplies data to the services that use it. Michigan's statewide repository is one example involving validation, aggregation, neighboring data and service-provider access. It is not a national requirement to use that particular process. [S10]
NENA's provisioning standard addresses GIS information used by the Emergency Call Routing Function and Location Validation Function, along with responsibilities around those services. [S05] Ask the operator which receipts, acceptance records and activation confirmations the actual system provides.
Separate these questions: Was the file received? Was it accepted? Was it loaded? Is that version active? Does the application being checked show that version? Record uncertainty when a milestone cannot be confirmed.
Plan for Updates and Recovery
Keep the last accepted package and an agreed recovery path. The responsible operator needs to know which version can be restored and under what conditions. Coordinate affected parties before replacing active data.
Arizona's November 2023 webinar Q&A describes a staged process and a quarterly cycle used in that project at that time. Use current service agreements and operational needs for your own timing. [S30, PDF pp. 1–2]
Try It
List the evidence you would need to change PKG09's status from “sent” to “confirmed active.” Who could supply each piece?
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-017 · Test a Data Release
Before running a test, write what should happen. Without an expected result, a successful-looking screen is hard to evaluate.
Give the Test a Specific Question
“Run the tool on the county” names an activity. A useful test is more precise: “For synthetic address A118, matching settings P02 should keep two possible roads when the community value is missing.” Save that small input, its expected result and the actual result together.
Read the figure description
A test flow uses a known fixture and expected result, observes behavior, preserves evidence and routes a failed or ambiguous result to correction before acceptance.
Original TAP recommended test workflow.
| Example | Expected observation | Evidence |
|---|---|---|
| Ordinary exact address match | One candidate under the teaching profile | Input and selected candidate |
| Missing context | Ambiguous result preserved | Candidate list and reason |
| Invalid input structure | Explicit processing failure | Error category and affected input |
| Excluded record | Exclusion reported separately | Scope and exclusion count |
| Rule configuration change | New result linked to new configuration | Both configurations and comparison |
| Corrected feature | Comparable rerun supports the review outcome | Before, after and coverage |
Conformance testing asks whether a component meets applicable requirements. Interoperability testing asks whether components work together as needed. Success in one does not establish the other. The National 911 Program identifies both as important. [S15]
Make the Test Repeatable
Use synthetic records or an authorized protected test copy. Record the software version, data version, settings and environment. State the expected output and what counts as passing before execution.
Keep relevant logs, output records and screenshots. Compare the observed result with the expectation, including inputs that were excluded or could not be processed. Ask the responsible reviewer to resolve differences.
Save useful examples as regression tests: repeatable checks that can reveal whether a later change breaks behavior you previously verified. Include difficult examples as well as ordinary ones.
Record the Acceptance Decision
A release decision should identify what was accepted, by whom, for which use and with which unresolved conditions. Tests support that accountable decision; a clean summary screen does not make it automatically.
Any integration or live-system testing must follow the agency's authorized arrangements. These learning exercises do not authorize test calls, load testing or changes to operational routing. Field Book clarity review and product evaluation are separate activities, with separately agreed scopes.
Try It
Write one expected result before running a test. If you cannot say what should happen, identify the missing requirement or decision first.
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-018 · Maintain GIS Data After Delivery
The first accepted delivery starts an ongoing responsibility. Roads, addresses, service areas and operating arrangements continue to change.
Follow a Change to Its Destination
Capture the reported change, source and effective date. Identify the records and consuming systems it could affect. Assign a responsible owner and priority under local policy. Make an authorized source change, then check the result and related records.
Deliver the revised package through the agreed process. Obtain acknowledgment and verify the expected state in the receiving service. Tell the reporter what happened or what remains unresolved. How GIS Data Reaches a Service explains why delivery and activation need separate evidence.
The National 911 Program's GIS assessment and leadership checklists identify maintenance, partnerships, funding and responsibilities as continuing implementation needs. [S11; S12]
| Measure | Interpret alongside it | What it helps you see |
|---|---|---|
| Age of unresolved discrepancies | Priority, ownership and dependency | Work that is waiting too long |
| Time from approved change to activation | Batch schedule and receiving delays | Where handoffs slow down |
| Coverage of executed checks | Excluded records and failures | What the report actually establishes |
| Recurring cause categories | Data volume and rule changes | Where training or design could help |
| Reopened decisions | Reason and comparable rerun evidence | Whether earlier assumptions still hold |
Measure Work That Matters
A single “percent clean” figure hides important differences. One unresolved service-area issue may matter more than many formatting warnings. A finding count can increase because a better check has been added, even while the data improves.
Explain why a count changed. Track aging unresolved issues, completed handoffs, repeat problems and whether people received useful answers. Keep the scope and limitations beside each measure.
Recognize an Urgent Discrepancy
Suppose a newly occupied site appears assigned to an unexpected service area. Preserve the observed record and identify the release in use. Follow the agency's approved escalation path for a possible operational issue. A routine data queue should record the event, but it should not be the only route to people responsible for current service.
Keep the operational incident record separate from a public lesson. A later, cleared explanation can teach the cause and prevention without exposing caller information or sensitive system details.
Try It
After a source correction, who confirms that the service received the change? Who closes the loop with the person who reported it?
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-019 · Plan for Different Ways to Communicate
An emergency communication workflow must account for the people who use it. A product label does not tell you whether a particular person can reach help through the channels available in that location.
Check the Actual Experience
A person may communicate through speech, text, a relay service or another supported channel. Ask the responsible operations team how each supported mode enters the workflow, transfers between services and reaches the people who need the information.
The National 911 Program's telecommunicator guide discusses multimedia, text access and training during transition. SMS text-to-911 is one capability; its availability does not by itself establish a complete NG9-1-1 implementation. [S18] The fire, EMS and law-enforcement guides offer introductions for those roles. [S19; S20; S21]
Include operators and people with relevant accessibility experience when designing scenarios. Check what happens when audio cannot be heard or an image cannot be seen. Confirm training, staffing, interpretation and escalation arrangements through the agency's process. Describe actual limitations clearly.
Make the Learning Material Usable Too
Readers should not need prior GIS knowledge to begin. Explain terms before relying on them. Give each diagram a written explanation. Use headings, descriptive links and labels that do not depend on color alone.
| Design choice | Reader benefit | Review question |
|---|---|---|
| Define an acronym at first use | Readers can enter without prior jargon | Can a new reader follow this paragraph? |
| Explain every diagram in text | Meaning remains available without the picture | Does the description include the relationships? |
| Use labels and shapes with color | Meaning survives grayscale or color differences | Can the symbols be distinguished without hue? |
| Use real headings and linked navigation | Readers can move by topic | Does the navigation order make sense? |
| Break procedures into actions | Readers can resume after interruption | Is the next action explicit? |
Someone reading on a small screen, using assistive technology, working in a second language or returning after a long shift may need a different route through the same material. Short sections and optional technical detail support those needs without removing the substance.
Figures in this collection include text alternatives. If a diagram, term or page is difficult to use, share the article number and where you got stuck on TAP. That feedback helps improve the explanation and the reading experience.
Try It
Cover a diagram and read its description aloud. Can you explain its main lesson without seeing the image? Record any missing relationship or warning.
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-020 · Interoperability, Security and Regional Differences
Two systems can exchange a file successfully and still leave people unable to complete the task. Check the meaning of the information, the operating workflow and the responsibilities around the handoff.
Ask What Must Work Together
NG9-1-1 interoperability concerns services working across system and jurisdiction boundaries. Computer-aided dispatch, or CAD, has additional challenges because systems may store and exchange incident information differently. FirstNet and NG9-1-1 serve related but different parts of public safety communications. [S15; S16; S17]
Read the figure description
A central handoff depends on compatible meaning, transport, authorized access and operational procedure. Each dependency has an observable question.
Original TAP explanatory framework.
| Area | Ask for | Look for in the answer |
|---|---|---|
| Meaning | Field definitions and transformations | The same place and incident concepts survive the handoff |
| Compatibility | Named versions and interface tests | Observed behavior in the actual configuration |
| Access | Approved identities and permissions | Named owners and authorized roles |
| Continuity | Failure and recovery exercise | Expected behavior and recovery evidence |
| Operations | Transfer and escalation procedure | People know who takes the next action |
Start with one expected handoff. What must be sent? What must the receiver understand and do? Who notices a failure? Who can authorize a correction? Test the agreed behavior rather than assuming that matching product labels establish compatibility.
Coordinate Security Responsibilities
Cyber risks can disrupt emergency communications. The National 911 Program's CISA interview discusses threats including telephony denial of service, ransomware and malicious messages, as well as resilience assistance. [S23]
For a GIS team, practical questions include who may access the data, who can approve changes, which evidence must be retained and who owns recovery. Coordinate these responsibilities with the security and operations teams. Public teaching examples should not reveal sensitive configurations.
Keep Regional Requirements Distinct
CRTC Decision 2025-64 adopts the NENA GIS model as Canada's baseline and addresses Canadian mapping, civic-format work and tactical routing considerations. Its conclusions distinguish the adopted baseline from encouragement directed to stakeholders. Do not turn every recommendation into a universal obligation. [S27, paragraphs 8–23]
The U.S. National 911 Program describes a two-phase originating-provider transition framework triggered by valid 911 authority requests. This article does not determine whether a request is valid or calculate a legal deadline. [S24]
For a requirement, record the country, state or province, service, document version, receiving requirements and effective date. If sources conflict, compare their scope and authority and refer unresolved interpretation to the responsible owner.
Try It
Describe a handoff that delivers a file successfully but still fails the operational purpose. What evidence would expose that failure?
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-021 · Troubleshoot Common GIS Problems
Choose the GIS problem closest to yours. Each fictional example describes what you might see, what evidence to inspect and where to read more.
Addresses and Access
Two roads named Cedar Court
What you see. A point matches two roads with the same base name.
How to investigate. Compare full components, community and authoritative context. Preserve both candidates until the rule or evidence distinguishes them.
Keep in mind. Do not choose the nearest merely to remove ambiguity.
Related articles
A driveway reaches another street
What you see. The building is addressed on one street but entered from another.
How to investigate. Separate civic association, placement and access questions. Review the documented representation.
Keep in mind. A fishbone is not a vehicle route.
Related articles
Several units share one building
What you see. Labels look duplicated when unit information is hidden.
How to investigate. Inspect complete civic elements and feature purpose. Determine whether records represent units, sites or repeated imports.
Keep in mind. Deleting apparent duplicates can lose meaningful information.
Related articles
A campus has named buildings
What you see. The caller gives a building name rather than a complete street address.
How to investigate. Review approved campus references, civic records and supported aliases with the responsible authority.
Keep in mind. A familiar local nickname may not be known to a remote call taker.
Related articles
A street is renamed
What you see. GIS and legacy records use different names.
How to investigate. Compare official effective dates, alias policy and downstream update timing. Coordinate changes.
Keep in mind. Uniform text today does not prove correct historical handling.
Related articles
A point has no generated connector
What you see. A fishbone output omits a record.
How to investigate. Check which inputs were included, required attributes, processing failures and matching outcomes.
Keep in mind. No connector does not prove no address.
Related articles
A numeric conversion drops a suffix
What you see. 118A becomes 118 during export.
How to investigate. Preserve the source value, inspect the mapping and review all affected records.
Keep in mind. Structural success can hide loss of address meaning.
Related articles
A postal label differs from a municipal label
What you see. The same place has different community names in different sources.
How to investigate. Identify the meaning of each field and preserve the required distinctions in the crosswalk.
Keep in mind. Postal usage does not settle every civic or service boundary question.
Related articles
A precise coordinate points to the wrong entrance
What you see. Measurement precision appears high but access is wrong for the task.
How to investigate. Confirm what was measured, its reference system and the intended use.
Keep in mind. Precision alone does not establish fitness for the workflow.
Related articles
Roads and Boundaries
A road ends at a cul-de-sac
What you see. Topology flags a line endpoint.
How to investigate. Confirm the road’s real end and the scope of the configured check. Keep evidence for a valid terminal condition.
Keep in mind. A dangle flag is a review prompt.
Related articles
A bridge crosses another road
What you see. Two lines intersect in a view from above.
How to investigate. Review whether one road passes above the other and the consuming application’s connectivity model.
Keep in mind. Two lines crossing on a flat map does not prove an junction where roads meet at the same level.
Related articles
A road follows a jurisdiction line
What you see. Left and right contexts differ.
How to investigate. Check side-dependent attributes and the shared-edge agreement with both maintainers.
Keep in mind. Copying one side to the other can erase a real distinction.
Related articles
An annexation changes a city limit
What you see. An administrative boundary changes but service agreements differ.
How to investigate. Ask which service changes, who approves it and when it takes effect.
Keep in mind. A municipal change does not answer every service question.
Related articles
An island or isolated road exists
What you see. A connection check reports a disconnected feature.
How to investigate. Verify geography, access and the intended network representation.
Keep in mind. Automatic snapping can create a fictional connection.
Related articles
A temporary responder assignment changes
What you see. Operations need a short-term destination change.
How to investigate. Use the responsible authority’s approved operational change path and confirm how it interacts with GIS maintenance.
Keep in mind. Do not assume moving a service polygon is the authorized tactical mechanism.
Related articles
A road is split during maintenance
What you see. One record becomes several child records.
How to investigate. Review history of record identities after changes, ranges, side attributes and dependent associations under the project policy.
Keep in mind. Keeping the same picture does not preserve all record relationships.
Related articles
Testing and Delivery
A finding disappears after settings change
What you see. A later report has fewer results.
How to investigate. Compare rules, parameters, input scope and execution status before calling it corrected.
Keep in mind. A changed test is new evidence about a changed question.
Related articles
The upload succeeds but maps look old
What you see. Sender and viewer disagree about the visible release.
How to investigate. Trace package receipt, acceptance, activation and application cache or refresh behavior.
Keep in mind. Upload success does not identify the active consumer release.
Related articles
A record was deleted
What you see. A previous finding cannot be found in the current input.
How to investigate. Review deletion authority, replacement identity and downstream removal acknowledgment.
Keep in mind. Disappearance is not a documented review outcome.
Related articles
A provider and local check disagree
What you see. The same package receives different results.
How to investigate. Compare profiles, versions, input snapshots, scope and implementation assumptions; reproduce a small example.
Keep in mind. Different counts do not identify which checker is correct.
Related articles
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-022 · Procedures for GIS Review
Choose a procedure for the task in front of you. Each one names what you need, the steps to take and the evidence to keep. Use your agency’s approved process when authority or information is missing.
Investigate a long fishbone
Determine what relationship produced the connector before changing data.
Have ready. Point and road identifiers, input snapshot, generator method and settings.
- Preserve the connector and its related records.
- Check whether the method used attributes, nearest geometry, interpolation or an existing link.
- Compare all plausible road candidates and the complete address context.
- Check point purpose, unusual setback and documented access.
- Obtain authoritative evidence for any proposed source change.
- Record the review outcome, rerun a comparable example and link the evidence.
Complete when. The observed relationship, cause or remaining uncertainty, responsible owner and verification evidence are recorded.
Pause and resolve when. The source authority is unclear or multiple candidates remain unresolved.
Prepare a schema conversion
Produce a reviewable exchange mapping without losing source meaning.
Have ready. Source snapshot, target model version, receiving requirements and settings and mapping revision.
- Inventory source fields and intended concepts.
- Map types, lengths, domains and conditional values to the actual target.
- Preserve originals for transformations and ambiguous parsing.
- Test ordinary records, units, suffixes, nulls and maximum-length values.
- Compare counts, identities and rejected values.
- Review the converted package and keep it with the source and mapping.
Complete when. Every transformation and rejection can be explained and reproduced.
Pause and resolve when. A mapping requires inventing authoritative information or silently discarding it.
Review a shared boundary
Resolve a spatial discrepancy with the people authorized to decide it.
Have ready. Compatible neighboring snapshots, boundary purpose, service, coverage extent and agreements.
- Mark the exact area and affected feature identifiers.
- Confirm that the comparison concerns the same service and time.
- Ask both providers for their source evidence and approving authority.
- Record the approved shared edge and effective date.
- Review dependent road splits, points and assignments.
- Coordinate delivery and retain acknowledgments from affected parties.
Complete when. The edge has a named authority, documented agreement and verified downstream treatment.
Pause and resolve when. A technical editor is being asked to settle an unresolved service responsibility dispute.
Compare two validation runs
Determine whether changed results support a correction conclusion.
Have ready. Both snapshots, rule versions, settings, coverage reports and record history across edits or replacements.
- Confirm each run completed and identify failures.
- Compare input scope, exclusions and eligible counts.
- Compare rule definitions and parameters, including units.
- Follow the affected source identity across edits or replacements.
- Classify each changed finding as comparable, changed test, removed input or unresolved.
- Carry forward a decision only with a recorded basis for applicability.
Complete when. The comparison explains why every material result changed.
Pause and resolve when. The older inputs or execution configuration cannot be recovered.
Hand off a data package
Make delivery and activation observable.
Have ready. Reviewed snapshot, manifest, coverage, decisions, receiver requirements and settings and approved delivery path.
- Freeze the package and assign an identifier.
- Check the manifest, intended extent and version.
- Deliver through the approved channel.
- Retain receipt and acceptance or rejection evidence.
- Confirm activation with the responsible service operator.
- Verify agreed examples and record the recovery reference.
Complete when. The sender can identify the exact active package and its verification evidence.
Pause and resolve when. The receiver or operator cannot identify which package was loaded.
Build a repeatable test
Preserve one resolved question as a repeatable test.
Have ready. A synthetic or authorized sanitized example, named expected behavior and configuration.
- Reduce the example to the minimum records needed.
- Write the expected result before execution.
- Include one nearby counterexample that should behave differently.
- Run the example and retain observed output.
- Record version and applicability.
- Add a clear explanation of what failure would mean.
Complete when. Another reviewer can reproduce the test without the original author explaining hidden assumptions.
Pause and resolve when. The test example exposes protected records or depends on unavailable live systems.
Reconcile a legacy discrepancy
Assign differences to their actual source and decision owner.
Have ready. Approved legacy and GIS snapshots, field crosswalk and source authority records.
- Preserve original values and dates.
- Document any normalization used only for comparison.
- Classify no match, multiple matches and incompatible descriptions separately.
- Inspect addressing decisions, rename history and effective dates.
- Route changes to the owner of each source.
- Verify the coordinated result and keep unresolved differences visible.
Complete when. Each discrepancy has evidence, an owner and a documented outcome.
Pause and resolve when. The comparison would disclose subscriber or operational information in the learning space.
Turn a reader question into a guide correction
Make a useful answer discoverable for the next reader.
Have ready. Chapter or figure reference, exact question, reader goal and sanitized example if relevant.
- Record the reader’s own wording before rewriting it.
- Decide whether the issue is terminology, missing context, ambiguity or a technical error.
- Locate the applicable primary source and version.
- Draft the explanation and a counterexample.
- Obtain the necessary technical review and record the decision.
- Update the article, related links and change log, then tell the original reader where the answer lives.
Complete when. The answer has a stable location and the original question is linked to it.
Pause and resolve when. The explanation would promote a disputed or unreviewed interpretation as a requirement.
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-023 · Suggest a Field Book Correction
If a reader cannot follow an explanation, that is useful feedback. Capture the point of confusion and improve the explanation where the next reader will find it.
Begin With the Reader's Question
Keep the reader's own wording and the task they were trying to complete. “Does the dashed line show the driveway?” may reveal a misleading diagram rather than a lack of effort by the reader.
Read the figure description
A loop connects the original reader question, source review, technical decision, published answer, related links and comprehension feedback.
Original TAP editorial workflow.
| Record | Example | Why it helps |
|---|---|---|
| Location | Chapter 10, Figure 6 or an exact sentence | Makes the issue findable even if pages change |
| Question in the reader’s words | Does this line show the driveway? | Preserves the misunderstanding |
| Intended task | Explain fishbones to a new GIS collaborator | Identifies the context needed |
| Safe example | Synthetic A118 screenshot | Allows discussion without customer records |
| Outcome | Add a connector versus route explanation | Turns feedback into a concrete improvement |
For that question, a useful answer is: “The dashed line shows the relationship created by this analysis. It does not show a driveway or an emergency vehicle route. Check the matching method and the related point and road records to understand why it was drawn.” Put the same distinction in the diagram's legend and description.
Match the Review to the Problem
A confusing term needs a clearer explanation. A missing reasoning step needs an example or transition. A claim about a standard needs a source and the appropriate technical review. Keep an unresolved interpretation visible rather than presenting it as a settled requirement.
A software defect belongs in the relevant product review process. A general learning question belongs with the article. Link the issues when needed, but do not publish confidential evaluation material or turn one product's behavior into a general NG9-1-1 rule.
Update the Maintained Copy
Groundtruth 911 updates the article after a correction is reviewed. The discussion on TAP can link readers back to the revised passage and explain what changed.
When technical meaning changes, keep the previous wording, new wording, reason, source and review decision. Update related figures, descriptions and lessons. Record the article revision and tell the original reader where the answer now lives.
Try It
Write a correction request that names the article, quotes the confusing sentence and explains what you expected to understand. You do not need to know the answer to report a useful question.
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-024 · Call Signaling, Media and Location
A test call appears connected, but one participant cannot hear the other. “Connected” is useful evidence about part of the system. It does not explain every part of the conversation.
Separate Three Questions
Session control concerns creating, changing or ending a communication session. Media is the voice or other supported content carried during it. Location and incident information describe places or events that people and applications may need to use.
Read the figure description
Three separate lanes connect an activity with evidence about that activity. Session control concerns setup and change messages. Media concerns the voice or other content and its intended two-way behavior. Location and incident information concern what was sent and what was received and used. Success in one lane does not verify the others.
Original TAP conceptual teaching diagram; signaling context [S37].
The three lanes in the figure are a teaching aid, not a network design. Success in one lane does not prove success in the others. A transfer might retain audio while location information is displayed unexpectedly. A receiving application might show an incident label but omit a field operators need.
| Observation | Question to investigate | Useful test artifact |
|---|---|---|
| Session establishment fails | Which request or response indicates the failure? | Authorized signaling trace reference |
| Audio is one way | Which media path and negotiated capability were observed? | Approved media test result |
| Location is missing or different | Which location information was conveyed and consumed? | Sanitized message and display comparison |
| Incident information is incomplete | Which interface maps those fields? | Expected and observed field comparison |
Collect Evidence for the Observed Problem
In an authorized integration exercise, give the test a shared label so participating teams can connect their records. Record the environment and clock context. Keep the data package and synthetic location input identifiable.
The GIS reviewer needs to find the relevant location and package. The network specialist needs to find the corresponding technical trace. Neither should have to infer the entire event from an unexplained map screenshot.
Ask a subject-matter reviewer to explain the relevant trace fields and their limits before using them in training. Public examples must remove protected identifiers and sensitive configuration while keeping enough context to teach the point. Prefer wholly synthetic examples and label them clearly.
When You Need More Detail
Session Initiation Protocol, or SIP, is a signaling protocol for creating, changing and ending sessions. Its invitations carry session descriptions used to agree on compatible media. Signaling and the media itself are related but distinct. [S37, abstract]
Try It
Explain why a successful session setup does not prove two-way audio or the expected location display. Name the additional observation you would need for each.
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-025 · Plan for Procurement and Long-Term Ownership
A proposed contract says the vendor will “validate and upload GIS.” That leaves several questions open: what will be checked, what happens to rejected records, and who confirms the service is using the approved data?
Describe an Outcome You Can Observe
Name the people and operational task the requirement supports. Identify the service, applicable standard and version, interfaces, expected behavior and acceptance method. Assign responsibility after delivery as well as during setup.
| Intention | Specify | Evidence to request |
|---|---|---|
| Receive clean GIS data | Profile, checks, exclusions and error reporting | A sample package and actual receiver report |
| Make updates reliable | Delivery, activation and recovery responsibilities | An exercised change and recovery record |
| Support interoperability | Interfaces, versions and test scenarios | Observed cross-component results |
| Preserve institutional knowledge | Documentation, data ownership and handover | A new operator can follow the procedure |
| Keep the service sustainable | Maintenance scope and change process | Named owners and lifecycle plan |
For the fictional contract above, ask which inputs are included, how excluded and unmatched records are reported, who resolves addressing disputes and whether the receiving service performs further checks. Ask who confirms activation and how that confirmation is recorded. Several parties may own different steps.
The National 911 Program's procurement guidance discusses scope, negotiation and security considerations. Its Interstate Playbook addresses interconnection planning and coordination. These are planning references; current rules, contract terms and local authority govern a real purchase. [S22; S38]
Plan Beyond Initial Delivery
Specify acceptance scenarios and the evidence they should produce. Clarify documentation, ownership, export and handover arrangements. Plan ongoing updates, incident coordination, maintenance and recovery. Do not leave essential handoffs dependent on one person's memory of a conversation.
A broad claim such as “supports NG9-1-1” cannot replace this work. The standards overview explains the role of standards in interoperation; a project still needs to define which requirements and behaviors it will evaluate. [S36]
Route contractual and regulatory interpretation to the authorized procurement and legal roles. TAP helps readers understand the questions and evidence; a general field guide does not replace the project's procurement process.
Try It
Rewrite “validate and upload GIS” as one observable requirement. Include the scope, expected evidence and the person responsible for accepting the result.
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-026 · Check Your Understanding
Choose a question and answer it in your own words. Open it to compare your reasoning and revisit the relevant article.
What is the difference between a GIS quality check and the LVF?
A GIS check examines data under selected rules. The LVF validates civic location information within the i3 architecture. A local validator is not itself an LVF.
Review Core 911 System Terms and What Does a Zero-Finding Report Tell You?.
Why can a nearest-road result be misleading?
The correct civic association can depend on name, community, range, aliases and representation. A nearer road may provide physical access or simply be nearby.
Review Caller Location and Incident Location and Explain an Address Match.
Does a long fishbone mean the address point is wrong?
It identifies a relationship to investigate. The point, road, matcher, settings or intended representation may explain it.
Does a road dangle always need repair?
No. A real road end, study edge or other documented condition can explain it. Review the configured rule and evidence.
Review Review Geometry and Topology.
What does a zero-finding report establish?
Only what the executed checks found within their eligible input scope. Exclusions, failures and untested questions remain relevant.
Why retain a rule version with a finding?
The observation depends on the question and method used. A changed rule can change results or the applicability of a prior decision.
When can a missing finding support a correction conclusion?
When comparable successful execution examined the relevant updated feature under the intended scope and the retained evidence supports the review outcome.
What is different about a provisioning and PSAP boundary?
One concerns GIS supply responsibility; the other concerns primary PSAP service coverage. Their shapes need not match.
When is an upload confirmed active?
When the responsible operator identifies the activated package and the agreed verification supports that state. A receipt alone is insufficient.
Review How GIS Data Reaches a Service.
Which source should change when GIS and MSAG differ?
Investigate authority, field meaning and effective dates. Either source, the mapping or the comparison assumptions may need correction.
Why test both conformance and interoperability?
Meeting a specification and working successfully with other components are related but different questions.
Review Test a Data Release and Interoperability, Security and Regional Differences.
How should an uncertain explanation enter TAP?
As a question linked to a specific passage or example, with its scope and uncertainty retained until it receives the necessary evidence and review.
Review Suggest a Field Book Correction.
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-027 · Glossary
Use this glossary when a term interrupts your reading. Read the short meaning, then return to the article for an example.
These are learning explanations, not official definitions. When implementing a standard, use the named edition and its precise terms. A familiar word can have a narrower meaning in a particular system.
| Term | Meaning in this guide | Read more |
|---|---|---|
| 9-1-1 authority | The governmental entity responsible for the relevant 9-1-1 service decisions. | Who Owns the Next Step? |
| Address point | A GIS point representing a documented civic location or address-related feature. | Read an Address Point |
| Aggregation | Combining contributions into a broader dataset under an agreed process. | How GIS Data Reaches a Service |
| ALI | Automatic Location Identification; a legacy call-location information term. | Reconcile GIS With Legacy Records |
| Alias | An alternate name or description recognized under the applicable addressing policy. | Read an Address Point |
| Ambiguous match | More than one plausible candidate remains under the stated matching method. | Explain an Address Match |
| Attribute | A value stored about a feature, such as its street name. | Choose the Right GIS Data Model |
| Authoritative source | The designated source used to establish a particular fact or decision. | Who Owns the Next Step? |
| BCF | Border Control Function; a core-services boundary-control term. | Core 911 System Terms |
| CAD | Computer aided dispatch; systems supporting dispatch and associated incident work. | Follow an Emergency Call |
| Candidate | A record that survives the stated preliminary matching conditions. | Explain an Address Match |
| Civic location | A description of place using address-related elements. | Caller Location and Incident Location |
| CLDXF | Civic Location Data Exchange Format; a NENA civic-address exchange standard family. | Choose the Right GIS Data Model |
| Conformance | Meeting the requirements of a named applicable specification. | Test a Data Release |
| Coordinate reference system | The reference information needed to interpret coordinate values. | Caller Location and Incident Location |
| Coverage | The inputs and questions actually included in an executed check. | What Does a Zero-Finding Report Tell You? |
| Dangle | A line endpoint identified by a connection rule. Review why the line ends before deciding it is an error. | Review Geometry and Topology |
| Discrepancy | A reported difference or concern requiring investigation and review outcome. | Maintain GIS Data After Delivery |
| Review outcome | The recorded review outcome, such as unresolved, corrected or accepted as a documented exception. | How Can You Tell a Finding Was Fixed? |
| Domain | The allowed values or value structure for a field. | Choose the Right GIS Data Model |
| E9-1-1 | Enhanced 9-1-1; the legacy system context discussed during transition. | Reconcile GIS With Legacy Records |
| ECC | Emergency communications center; terminology used for emergency communications operations. | Follow an Emergency Call |
| ECRF | Emergency Call Routing Function; location and service lookup supporting call routing. | Core 911 System Terms |
| Effective date | The date when a decision or representation is intended to apply. | Understand Service and Provisioning Boundaries |
| ESInet | Emergency Services IP Network. | Core 911 System Terms |
| ESRP | Emergency Service Routing Proxy; a policy-aware call-routing function. | Core 911 System Terms |
| Exception | A documented reason an observed condition receives a particular approved treatment. | Review Geometry and Topology |
| Exchange package | An identified set of data prepared for delivery to another party. | How GIS Data Reaches a Service |
| Feature | A stored representation of a place or object, such as a road line, address point or service area. | Choose the Right GIS Data Model |
| Finding | A recorded observation produced by a named check or review. | How Can You Tell a Finding Was Fixed? |
| FirstNet | A public-safety broadband network context distinct from NG9-1-1. | Interoperability, Security and Regional Differences |
| Fishbone | A visual connector showing an address-to-road relationship under a stated method. | Why Does This Address Connect to That Road? |
| Fixture | A controlled example with a defined expected result for testing. | Test a Data Release |
| Geodetic location | Location expressed through coordinates or geographic shapes. | Caller Location and Incident Location |
| Geometry | The stored shape of a feature. | Review Geometry and Topology |
| Geoprocessing | Operations that transform or analyze geographic data. | Review Geometry and Topology |
| GIS | Geographic information system: data, tools and practices for working with information about places. | Where GIS Fits in 911 |
| Identity lineage | The record of how feature identities relate after edits, splits, merges or replacements. | How Can You Tell a Finding Was Fixed? |
| Interoperability | Different systems working together successfully within a stated scope. | Interoperability, Security and Regional Differences |
| i3 | NENA’s NG9-1-1 architecture and interface standard family. | Core 911 System Terms |
| LIS | Location Information Server. | Core 911 System Terms |
| LoST | Location to Service Translation; a protocol for location-based service lookup. | Caller Location and Incident Location |
| LVF | Location Validation Function; validates civic location information in the i3 context. | Core 911 System Terms |
| Manifest | A record of what an identified delivery package contains. | How GIS Data Reaches a Service |
| MSAG | Master Street Address Guide; a legacy addressing and service-assignment resource. | Reconcile GIS With Legacy Records |
| NGCS | Next Generation Core Services. | Core 911 System Terms |
| NGUID | NENA Globally Unique ID; consult the model for its exact construction and use. | Choose the Right GIS Data Model |
| Normalization | A documented change to values for consistent comparison, such as a stated treatment of abbreviations. | Explain an Address Match |
| Parity | The odd, even or other defined number pattern for a road-side address range. | Read a Road Centerline |
| PIDF-LO | Presence Information Data Format Location Object; a format carrying location information. | Caller Location and Incident Location |
| Polygon | A GIS area representation. | Understand Service and Provisioning Boundaries |
| Profile | A named set of requirements or settings used for a particular exchange or check. | Choose the Right GIS Data Model |
| Provisioning | Supplying data to the functions that use it. | How GIS Data Reaches a Service |
| Provisioning boundary | The area defining responsibility for supplying GIS data. | Understand Service and Provisioning Boundaries |
| PSAP | Public safety answering point: a center where emergency requests are answered. | Follow an Emergency Call |
| Range | The address-number interval represented by a road-side attribution. | Read a Road Centerline |
| RCL | Road centerline. | Read a Road Centerline |
| Regression test | A repeatable check that detects changes to previously expected behavior. | Test a Data Release |
| Release | An identified edition of a dataset, service configuration or publication. | How GIS Data Reaches a Service |
| Schema | The structure of a database or file, including field names and the kinds of values they hold. | Choose the Right GIS Data Model |
| Service boundary | A geographic area associated with a named service responsibility. | Understand Service and Provisioning Boundaries |
| SI | Spatial Interface; provisions GIS information to consuming functions. | Core 911 System Terms |
| Snapshot | A retained state of input data at a specific point in the workflow. | How Can You Tell a Finding Was Fixed? |
| SSAP | Site/Structure Address Point. | Read an Address Point |
| Topology | Rules or relationships concerning how spatial features connect or overlap. | Review Geometry and Topology |
| Traceability | The ability to follow an explanation, observation or decision to its basis and consequences. | How Can You Tell a Finding Was Fixed? |
| Validation | A family of checks; always identify which kind, scope and implementation is meant. | What Does a Zero-Finding Report Tell You? |
| Version | The identified edition or revision of a rule, standard, dataset or publication. | Choose the Right GIS Data Model |
Practice Cedar Court · Discuss or suggest a correction · Contents
TAP-FG-028 · Sources and Standards
A statement that something is required should lead you to the document that requires it. A practical suggestion should be labeled so you can tell it apart from a standard.
This collection uses the standards, government resources and guidance listed below. Source references identify the publication and the relevant section so you can follow a claim. All worked examples are fictional, and the figures are original teaching diagrams. The collection is an educational reference; it does not establish that a dataset or system meets every applicable requirement.
The GIS model edition cited here is NENA-STA-006.3-2026. The i3 architecture reference is NENA-STA-010.3f-2021, with the correction dated December 17, 2024. Check the edition and receiving requirements that apply to your own project before using a passage as a requirement.
S01 · Next Generation 911
National 911 Program. Current overview.
Where to look. Overview paragraphs and transition discussion.
S02 · NENA i3 Standard For Next Generation 9-1-1
NENA. NENA-STA-010.3f-2021, correction dated December 17, 2024.
Where to look. Sections 3.4, 3.6, 4.2 and 4.3; glossary.
Used here for. The roles of routing functions, location validation and GIS provisioning. Detailed interface behavior requires the full standard.
Read S02 NENA i3 Standard For Next Generation 9-1-1
S03 · Standard For NG9-1-1 GIS Data Model
NENA. NENA-STA-006.3-2026.
Where to look. Executive overview; sections 3 and 4; Appendix E.
Used here for. Data structures, layer definitions and the distinction between the flat-file and relational models. NENA Board approval: March 11, 2026.
Read S03 Standard For NG9-1-1 GIS Data Model
S04 · Information Document For GIS Data Stewardship For NG9-1-1
NENA. NENA-INF-028.2-2023.
Where to look. Executive overview; section 3; coordination and aggregation.
Read S04 Information Document For GIS Data Stewardship For NG9-1-1
S05 · Standards For The Provisioning And Maintenance Of GIS Data To ECRF And LVFs
NENA. NENA-STA-005.1.2-2022.
Where to look. Executive overview; sections 3 and 4.
Read S05 Standards For The Provisioning And Maintenance Of GIS Data To ECRF And LVFs
S06 · GIS Data Transition Information Document
NENA. NENA-INF-046.1-2024.
Where to look. Sections 3 and 4; stakeholder responsibilities.
Read S06 GIS Data Transition Information Document
S07 · Recommended Validations For NG9-1-1 GIS Data
NSGIC. Published May 2026.
Where to look. Pages 1 and 2; validation tables.
Read S07 Recommended Validations For NG9-1-1 GIS Data
S08 · Statewide NG9-1-1 Training GIS Concepts 2
Oklahoma 9-1-1 Management Authority. Exercise manual; historical software workflow.
Where to look. Printed pages 12, 15 and 23; PDF pages 17, 20 and 28.
Read S08 Statewide NG9-1-1 Training GIS Concepts 2
S09 · Wisconsin NG9-1-1 GIS Data Standard And Best Practices
Wisconsin Office of Emergency Communications. State guidance, accessed October 17, 2026.
Where to look. Quality control and synchronization sections.
Read S09 Wisconsin NG9-1-1 GIS Data Standard And Best Practices
S10 · Michigan Statewide NG911 GIS Repository
Michigan DTMB. Current repository overview.
Where to look. 911 GIS overview; benefits; training links.
Read S10 Michigan Statewide NG911 GIS Repository
S11 · GIS In 911
National 911 Program. Page updated June 14, 2024.
Where to look. Project findings and national strategy summary.
S12 · Using The Checklists
National 911 Program. Next Generation 911 GIS Checklist white paper.
Where to look. Checklist purpose and use.
S13 · NG911 Interstate Playbook Chapter 2
National 911 Program. Historical planning reference.
Where to look. GIS data sharing, boundaries and interconnection discussion.
Read S13 NG911 Interstate Playbook Chapter 2
S14 · NG911 Interstate Playbook Chapter 3
National 911 Program. Historical planning reference.
Where to look. Operational transition and procedures.
Read S14 NG911 Interstate Playbook Chapter 3
S15 · NG911 Interoperability
National 911 Program. Current project overview.
Where to look. Conformance and interoperability testing discussion.
Read S15 NG911 Interoperability
S16 · CAD Interoperability
National 911 Program. Current project overview.
Where to look. CAD assessment and transfer barriers.
S17 · NG911 And Firstnet Guide For State And Local Authorities
National 911 Program and NASNA. Guide landing page.
Where to look. Guide description and system comparison.
Read S17 NG911 And Firstnet Guide For State And Local Authorities
S18 · Next Generation 911 For Telecommunicators
National 911 Program. Published guide.
Where to look. Printed pages 2, 3 and 7.
Read S18 Next Generation 911 For Telecommunicators
S19 · NG911 Guide For Fire Service Leaders
National 911 Program. Guide landing page.
Where to look. Guide scope, examples and infographic description.
Read S19 NG911 Guide For Fire Service Leaders
S20 · NG911 Guide For Leaders In EMS
National 911 Program. Guide landing page.
Where to look. Guide scope and examples description.
Read S20 NG911 Guide For Leaders In EMS
S21 · NG911 Guide For Leaders In Law Enforcement
National 911 Program. Guide landing page.
Where to look. Guide scope and checklist description.
Read S21 NG911 Guide For Leaders In Law Enforcement
S22 · Next Generation 911 Procurement Guidance
National 911 Program. Published 2016.
Where to look. Scope of work, negotiation and security considerations.
Read S22 Next Generation 911 Procurement Guidance
S23 · How Cyber Resilient Is Your 911 Center
National 911 Program. December 2023 newsletter.
Where to look. CISA CR911 discussion and threat examples.
Read S23 How Cyber Resilient Is Your 911 Center
S24 · NG911 Requests From 911 Authorities
National 911 Program. Current project page.
Where to look. Two-phase request framework.
Read S24 NG911 Requests From 911 Authorities
S25 · LoST: A Location-to-Service Translation Protocol
IETF RFC Editor. RFC 5222, August 2008.
Where to look. Abstract; sections 1, 8 and 12.
Read S25 LoST: A Location-to-Service Translation Protocol
S26 · Revised Civic Location Format For PIDF Lo
IETF RFC Editor. RFC 5139, February 2008.
Where to look. Abstract and civic location elements.
Read S26 Revised Civic Location Format For PIDF Lo
S27 · NG9-1-1 Mapping And Addressing Considerations
CRTC. Telecom Decision 2025-64.
Where to look. Paragraphs 8 to 23.
Read S27 NG9-1-1 Mapping And Addressing Considerations
S28 · National Strategy For GIS In NG911 And Tim Awareness
National 911 Program. Webinar November 14, 2023.
Where to look. Session description; speakers; links to transcript, slides and Q&A.
Read S28 National Strategy For GIS In NG911 And Tim Awareness
S29 · National Strategy For GIS In NG911 And Tim Awareness Transcript
National 911 Program. Webinar November 14, 2023.
Where to look. PDF pages 2 to 4; Eric Shreve and Jenna Leveille.
Read S29 National Strategy For GIS In NG911 And Tim Awareness Transcript
S30 · November 14 Webinar Questions And Answers
National 911 Program. 2023.
Where to look. PDF pages 1 and 2; Arizona project answers.
Read S30 November 14 Webinar Questions And Answers
S31 · State Of 911 Webinar Slides
National 911 Program. November 14, 2023.
Where to look. GIS collaboration presentation.
Read S31 State Of 911 Webinar Slides
S32 · Lights Camera NG9-1-1
Oregon Department of Emergency Management. Diana Gijselaers, August 26, 2015.
Where to look. Slides 12 to 22; vocabulary and GIS provisioning.
Read S32 Lights Camera NG9-1-1
S33 · NG911 GIS Data Model Documentation Index
NENA. Repository documentation.
Where to look. Version-specific standard links and glossary link.
Read S33 NG911 GIS Data Model Documentation Index
S34 · 2024 Annual Conference Content
NSGIC. September 2024 program.
Where to look. September 26 session listings.
Read S34 2024 Annual Conference Content
S35 · Program Areas And Presentations
Oregon Department of Emergency Management. Current resource page.
Where to look. NG9-1-1 Information Hub and GIS maintenance resources.
Read S35 Program Areas And Presentations
S36 · Standards For Enhanced And Next Generation 911
National 911 Program. Current overview.
Where to look. Role of standards in transition and interoperation.
Read S36 Standards For Enhanced And Next Generation 911
S37 · SIP Session Initiation Protocol
IETF RFC Editor. RFC 3261, June 2002.
Where to look. Abstract and overview.
Read S37 SIP Session Initiation Protocol
S38 · NG911 Interstate Playbook Chapter 1
National 911 Program. Historical planning reference.
Where to look. Governance and interconnection planning.
Read S38 NG911 Interstate Playbook Chapter 1
Research Coverage And Continuing Work
This first edition synthesizes the reviewed standards, government resources, state training and one webinar source family. It does not claim to contain every NG9-1-1 publication, all vendor implementations or every unusual local condition. In particular, full protocol engineering, indoor and vertical location implementation, detailed security control design, recording and retention policy, and jurisdiction-specific legal interpretation require deeper specialist chapters.
Practice Cedar Court · Discuss or suggest a correction · Contents